[edit] Introduction
Cranes are a very common feature on construction projects. All lifting operations should be planned carefully so they are carried out safely having assessed all the risks, and there are a number of regulations and safety guidelines that must be adhered to.
The two principal hazards associated with cranes are the collapse of the crane and loads falling from height, both of which present significant potential for injury, fatalities and damage, both on and off-site.
In April 2013, following a public consultation, the Notification of Conventional Tower Crane Regulations 2010 were revoked, meaning that there is now no longer a duty to notify tower cranes on construction sites to the HSE.
Nonetheless, it is still a legal requirement that all operations involving lifting equipment must be properly planned by a competent person, appropriately supervised, and carried out in a safe manner. Crane operators, and those directing lifting operations, must be trained and competent. Cranes must be of adequate strength, tested at prescribed intervals, and subject to the required examinations and inspections as laid out in BS 7121:1:2006 Code of practice for safe use of cranes.
In addition, the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) place duties on people and companies who own, operate or have control over lifting equipment.
[edit] CPA contract
Crane hire companies adhere to the terms and conditions of the Construction Plant Hire Association (CPA) and in accordance with BS 7121 The Safe Use of Cranes.
Under the terms of a standard CPA crane hire contract, the client hires the crane and operator. The client takes full responsibility for the execution of the lifting operation as well as the crane once it is brought onto the site. The client must have an Appointed Person who is made responsible for the lift and provide adequate insurance cover. If the client doesn’t have the necessary insurances, the company usually increases the hire charge.
[edit] CPA Contract Lift
Clients who are inexperienced in hiring cranes and so do not have the necessary competencies for safe planning and use are able to make use of a CPA Contract Lift service. This means that the crane owner provides insurance cover and retains responsibility for the crane and other equipment, the operator and all other personnel supplied with the crane, as well as all aspects of the lift plan and execution.
It is important to note that a Contract Lift is only valid when the crane owner supplies the Appointed Person to supervise. The client retains certain liabilities and should hold insurance to protect against such things as their own negligence, poor ground conditions, or the supply of incorrect information regarding the lift.
[edit] Wind
According to LOLER, appropriate devices should be made available to detect dangerous situations and allow for effective mitigation in conditions of high wind that may threaten a crane and/or its load. The information regarding the maximum wind speed in which the crane can be safely operated should be known and made available.
It is also important that cranes are made safe during out-of-service periods. Foreseeable wind speeds should be analysed from historical data and local wind studies. This will influence the height as well as the size of the foundations, ballast and jib counterweights used.
[edit] Related articles on Designing Buildings Wiki
- Avoiding crane collapses.
- Banksman.
- Cherry pickers.
- Construction plant.
- Construction tools.
- Crane supports.
- Demolition.
- Demolition grapple market trends.
- Electromagnetic overhead cranes.
- Equipment in buildings.
- Health and Safety.
- Lifting Operations and Lifting Equipment Regulations (LOLER).
- Scaffolding.
- Site safety.
- Temporary works.
- Types of crane.
- Work at height.
- Work at height checklist for managers.
- Work at height regulations.
[edit] External references
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.